STEPS INTO THE FUTURE

STEPS INTO THE FUTURE
17. May 2019 ArtHOC Design

As one of the world wide leading suppliers of the concrete industry, the Zenith Maschinenfabrik was at this year’s Bauma in Munich, too.
The challange to be met in the design was to create a hamonious balance between the oversized exhibit and the various communication areas.
The alignment of the machine was decisive for the architectural shaping.
Parallel to this, the upper floor was built whereby the exhibit was visually framed and highlighted.
Simultaniously, this construction formed a room structure that gave the communication space a protected atmosphere.